Thursday, March 1, 2012

NFPA 13 UG STUB-IN

NFPA 13, 2013 edition

6.3.1.1.1* Underground pipe shall be permitted to extend into the building through the slab or wall not more than 24 inches.

A.6.3.1.1.1 Extending the underground into a building provides working room to transition to the appropriate above ground piping. Environmental conditions should be considered as outlined in 23.1.6.1.2

posted by www.firebyknight.com

No comments:

Post a Comment