Saturday, March 3, 2012

LATERAL SWAY BRACING

9.3.5.3.1 - All feed and cross mains regardless of size and branch lines 2-1/2” and greater

9.3.5.3.2 – See Table 9.3.5.3.2 (a & b)

9.3.5.3.3 – Lateral Sway Brace not required on 2-1/2” starter pieces 12’ or less in length

9.3.5.3.4 – The last brace shall be no more than 6’ from the end of the last piece of pipe

9.3.5.3.5 – The last length of pipe shall have a lateral brace

www.firebyknight.com

No comments:

Post a Comment